For an enquiry call 0427844712 linkedin srcp

ZLA supplied for trial on pier of Figg Tree Bridge, NSW. ZLA for trial on Figg Tree Bridge pier

10 September 2012 : SRCP has supplied ZLA for a trial on a pier of Figg Tree Bridge, NSW. Roberto Giorgini of corrPRE advises that the ideal anode arrangement for bridges is water anodes for the lower tdal zone, Roll Anodes for the upper tidal and splash zones and ZLA for the spray zone.

Our Suppliers

client force technology       chemical newtech

  metalnastri       coRRpRe       protector1